NACE (National Association of Corrosion Engineers) International is a professional organization that focuses on corrosion prevention and control. As part of its mission, NACE offers a certification program for coating inspectors, known as the Coating Inspector Program (CIP). The program has three levels, with Level 1 being the entry-level certification. The NACE-CIP1-001 exam is the certification exam for Level 1 coating inspectors.


The NACE-CIP1-001 exam is a comprehensive test that assesses an individual’s knowledge and skills in coating inspection. The exam consists of 120 multiple-choice questions that must be completed within a four-hour time frame. The questions are designed to test an individual’s understanding of coating inspection procedures, surface preparation techniques, and application methods. The exam is offered in multiple languages to cater to a global audience.

 

NEW QUESTION # 21
If the project specification DOES NOT state the specific DFT measurement standards, the inspector should use

  • A. a detailed checklist and document the lack of a standard.
  • B. NACE 2/SSPC SP10
  • C. their best judgment based on similar projects and specifications.
  • D. a recognized industry standard like SSPC-PA 2 that is broadly accepted

Answer: D


NEW QUESTION # 22
Common errors that may produce inaccurate readings when using a Dial-Type Magnetic Pull-Off Dry Filth Thickness (DFT) gauge include:
Select All That Apply

  • A. Failing to determine the base metal reading (BMR)
  • B. Taking measurements too far from the edge of a surface
  • C. Rotating the dial too fast when taking measurements
  • D. Measuring ditty, tacky, or soft films

Answer: A,C,D


NEW QUESTION # 23
You are the NACE Inspector on a 5000 sq. ft. job where SSPC PA 2 has been specified.
Assuming all areas are in compliance, how many gauge readings and spot measurements are required?

  • A. 75 Gauge Readings resulting in 25 Spot Measurements
  • B. 105 Gauge Readings resulting in 35 Spot Measurements
  • C. 45 Gauge readings resulting in 15 Spot Measurements
  • D. 225 Gauge Readings resulting in 75 Spot Measurements

Answer: D


NEW QUESTION # 24
When applying Thermal Spray Coatings the specification is most likely to refence:

  • A. NACE SP 0188
  • B. SSPC PA 2
  • C. NACE SP 0178
  • D. SSPC-CS 23.00/AWS C2.23/NACE No. 12

Answer: D


NEW QUESTION # 25
The form of corrosion that has the largest potential for unexpected catastrophic failure is:

  • A. Atmospheric Corrosion
  • B. Galvanic Corrosion
  • C. General Corrosion
  • D. Localized Corrosion

Answer: B


NEW QUESTION # 26
An exposed area of the substrate or previous coat of a conductive coating material, often caused by poor application technique is called

  • A. cracking.
  • B. checking.
  • C. sagging.
  • D. holiday.

Answer: D


NEW QUESTION # 27
Excessive working of the surface with a power grinder can be detrimental because excessive burnishing

  • A. damages structural elements thereby speeding up the corrosion process.
  • B. develops a polished surface, which is a poor anchor profile for most coatings
  • C. scratches the surface too deeply resulting in uneven coating application
  • D. develops a good anchor profile resulting in uneven coating application.

Answer: B


NEW QUESTION # 28
Excess moisture during holiday testing can cause erroneous indications by creating a path across the surface of the coating to pinholes previously detected, or directly to the signal return connection.
This is often referred to as:

  • A. telegraphing.
  • B. monitoring
  • C. transitioning.
  • D. juxtaposing.

Answer: A


NEW QUESTION # 29
SSPC SP 1 identifies the use of:

  • A. Inorganic solvents
  • B. Biodegradable detergents
  • C. A wide variety of materials
  • D. Organic solvents

Answer: C


NEW QUESTION # 30
What is the minimum recommended distance away from an edge that an inspector should take a measurement with a dial-type magnetic pull-off Dry Film Thickness (DFT) gauge?

  • A. 2.5 millimeters (.10 inch)
  • B. 1 cm (.39 inch)
  • C. 2.5 cm (1 inch)
  • D. 6.35 cm (2.5 inch)

Answer: C


NEW QUESTION # 31
Check abrasive blast pressure close to the

  • A. compressor
  • B. substrate
  • C. blast pot
  • D. blast nozzle

Answer: D


NEW QUESTION # 32
According to SSPC PA 2 a Spot Measurement is:

  • A. A single gauge reading
  • B. The overall average of all readings
  • C. The average of gauge readings taken in a 4cm (1.5 inch) circle
  • D. The average of all spot measurements in a given area

Answer: C


NEW QUESTION # 33
In a non-convertible coating the role of the primary solvent is to:

  • A. To promote faster cure
  • B. To make the coating flow out better
  • C. To control the evaporation rate
  • D. To dissolve the resin

Answer: C


NEW QUESTION # 34
Non Conformance Reports are completed by the Inspector:

  • A. In every instance that an item does not meet the specification requirements
  • B. When the Inspector deems it to be a significant non-conforming item
  • C. When the Inspector and Contractor deem it to be a significant non-conforming item
  • D. In accordance with the specification's definition of a non-conformance

Answer: C


NEW QUESTION # 35
ISO SA 3 is directly equivalent to:

  • A. NACE No. 3/SSPC SP 6
  • B. NACE No. 1/SSPC SP 5
  • C. None of the above
  • D. NACE No. 2/SSPC SP 10

Answer: C


NEW QUESTION # 36
To achieve consistently accurate results with ALL alt test equipment

  • A. wash your hands before sampling.
  • B. calibrate the instrument in the field.
  • C. avoid placing the sample discs on a surface.
  • D. wear gloves when sampling.

Answer: A


NEW QUESTION # 37
The Inspector's Log Book is generally:

  • A. Shared with all parties upon project completion
  • B. Shredded by the inspector upon project completion
  • C. Retained by the inspector upon project completion
  • D. Submitted to the client upon project completion

Answer: C


NEW QUESTION # 38
Check abrasive blast pressure with a

  • A. needle pressure gauge
  • B. surface comparator
  • C. nozzle aperature gauge
  • D. replica tape

Answer: A


NEW QUESTION # 39
......