NEW QUESTION # 29
You need to recommend a solution to keep device properties synced to IoT Hub. The solution must minimize data loss caused by the connectivity issues.
What should you include in the recommendation?
- A. loT Hub device twins
- B. a cloud-to-device message
- C. Azure Event Grid
- D. the loT Hub direct method
Answer: A
Explanation:
Scenario: You discover connectivity issues between the IoT gateway devices and iothub1, which cause IoT devices to lose connectivity and messages.
To synchronize state information between a device and an IoT hub, you use device twins. A device twin is a JSON document, associated with a specific device, and stored by IoT Hub in the cloud where you can query them. A device twin contains desired properties, reported properties, and tags.
Reference:
https://docs.microsoft.com/en-us/azure/iot-hub/tutorial-device-twins
This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other question on this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next sections of the exam. After you begin a new section, you cannot return to this section.
NEW QUESTION # 30
You need to add Time Series Insights to the solution to meet the pilot requirements.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation:
Step 1: Provision Time Series Insights
Select Provision new IoT Hub to create a new IoT hub.
Step 2: Route telemetry from IoT Hub to a custom event.
Step 3: Add a data access policy to Time Series Insights for the dashboard web app Scenario: Requirements. Pilot Requirements During the pilot phase, devices will be deployed to 10 offices. Each office will have up to 1,000 devices.
During this phase, you will add Azure Time Series Insights in parallel to Stream Analytics to support real-time graphs and queries in a dashboard web app.
The pilot deployment must minimize operating costs.
Incorrect Answers:
No need to use an endpoint.
Reference:
https://docs.microsoft.com/en-us/azure/time-series-insights/time-series-insights-update-create-environment
NEW QUESTION # 31
You have an Azure IoT solution.
You need to create a digital twin model.
Which language should you use?
- A. YAML
- B. XHTML
- C. XML
- D. DTDL
Answer: D
Explanation:
Azure Digital Twins models are represented in the JSON-LD-based Digital Twin Definition Language (DTDL).
Reference:
https://docs.microsoft.com/en-us/azure/digital-twins/concepts-models
NEW QUESTION # 32
You need to add Time Series Insights to the solution to meet the pilot requirements.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
1 - Provision Time Series Insights
2 - Route telemetry from IoT Hub to a custom event.
3 - Add a data access policy to Time Series Insights for the dashboard web app Reference:
https://docs.microsoft.com/en-us/azure/time-series-insights/time-series-insights-update-create-environment
NEW QUESTION # 33
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
You have 20 IoT devices deployed across two floors of a building. The devices on the first floor must be set to 60 degrees. The devices on the second floor must be set to 80 degrees.
The device twins are configured to use a tag that identifies the floor on which the twins are located.
You create the following automatic configuration for the devices on the first floor.
You create the following automatic configuration for the devices on the second floor.
The IoT devices on the first floor report that the temperature is set to 80 degrees.
You need to ensure that the first-floor devices are set to the correct temperature.
Solution: In the automatic configuration for the second-floor devices, you set targetCondition to "tags.floor='second'".
Does this meet the goal?
- A. Yes
- B. No
Answer: A
Explanation:
Reference:
https://docs.microsoft.com/en-us/azure/iot-edge/module-deployment-monitoring?view=iotedge-2020-11
https://docs.microsoft.com/en-us/azure/iot-hub/iot-hub-automatic-device-management-cli
NEW QUESTION # 34
You need to add Time Series Insights to the solution to meet the pilot requirements.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation:
Step 1: Provision Time Series Insights
Select Provision new IoT Hub to create a new IoT hub.
Step 2: Route telemetry from IoT Hub to a custom event.
Step 3: Add a data access policy to Time Series Insights for the dashboard web app Scenario: Requirements. Pilot Requirements During the pilot phase, devices will be deployed to 10 offices. Each office will have up to 1,000 devices.
During this phase, you will add Azure Time Series Insights in parallel to Stream Analytics to support real-time graphs and queries in a dashboard web app.
The pilot deployment must minimize operating costs.
Incorrect Answers:
No need to use an endpoint.
Reference:
https://docs.microsoft.com/en-us/azure/time-series-insights/time-series-insights-update-create-environment
NEW QUESTION # 35
You have an Azure IoT solution that includes an Azure IoT hub, a Device Provisioning Service instance, and
1,000 connected IoT devices. The IoT devices are allocated to tour enrollment groups. Each enrollment group is configured to use certificate attestation.
You need to decommission all the devices in a single enrollment group and the enrollment group itself.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
To deprovision all of the devices that have been provisioned through an enrollment group:
* Disable the enrollment group to disallow its signing certificate.
* Use the list of provisioned devices for that enrollment group to disable or delete each device from the identity registry of its respective IoT hub.
* After disabling or deleting all devices from their respective IoT hubs, you can optionally delete the enrollment group. Be aware, though, that, if you delete the enrollment group and there is an enabled enrollment group for a signing certificate higher up in the certificate chain of one or more of the devices, those devices can re-enroll.
Reference:
https://docs.microsoft.com/en-us/azure/iot-dps/how-to-unprovision-devices
NEW QUESTION # 36
You need to install the Azure IoT Edge runtime on a new device that runs Windows 10 IoT Enterprise.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation:
Step 1: From Azure IoT Hub, create an IoT Edge Device
Step 2: Deploy-IoTEdge
The Deploy-IoTEdge command checks that your Windows machine is on a supported version, turns on the containers feature, and then downloads the moby runtime and the IoT Edge runtime. The command defaults to using Windows containers.
{Invoke-WebRequest -useb https://aka.ms/iotedge-win} | Invoke-Expression; ` Deploy-IoTEdge Step 3: Initialize-IoTEdge The Initialize-IoTEdge command configures the IoT Edge runtime on your machine. The command defaults to manual provisioning with Windows containers.
{Invoke-WebRequest -useb https://aka.ms/iotedge
Step 4: Enter the IoT Edge device connection string.
When prompted, provide the device connection string that you retrieved in step 1. The device connection string associates the physical device with a device ID in IoT Hub.
Reference:
https://docs.microsoft.com/en-us/azure/iot-edge/module-composition
NEW QUESTION # 37
You have an Azure IoT hub named Hub1 and a root certification authority (CA) named CA1. Hub1 is configured to use X.509 certificate device authentication.
You and a custom manufacturing partner complete a proof of possession flow.
You plan to deploy IoT devices manufactured by the custom manufacturing partner. Each device will have a certificate generated by an intermediate CA. The devices will authenticate by using device certificates signed by the partner.
You need to ensure that the custom devices can connect successfully to Hub1.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
Graphical user interface, text, application, chat or text message Description automatically generated
Box 1: Sign the intermediate CA certificate by using the CA1 certificate.
X.509 certificates are typically arranged in a certificate chain of trust in which each certificate in the chain is signed by the private key of the next higher certificate, and so on, terminating in a self-signed root certificate.
This arrangement establishes a delegated chain of trust from the root certificate generated by a trusted root certificate authority (CA) down through each intermediate CA to the end-entity "leaf" certificate installed on a device.
Box 2: Sign the device certificate by using the intermediate CA
An intermediate certificate is an X.509 certificate, which has been signed by the root certificate (or by another intermediate certificate with the root certificate in its chain). The last intermediate certificate in a chain is used to sign the leaf certificate. An intermediate certificate can also be referred to as an intermediate CA certificate.
Box 3: Deploy the certificate chain to the device.
The leaf certificate, or end-entity certificate, identifies the certificate holder. It has the root certificate in its certificate chain as well as zero or more intermediate certificates. The leaf certificate is not used to sign any other certificates. It uniquely identifies the device to the provisioning service and is sometimes referred to as the device certificate. During authentication, the device uses the private key associated with this certificate to respond to a proof of possession challenge from the service.
Reference:
https://docs.microsoft.com/en-us/azure/iot-dps/concepts-x509-attestation
NEW QUESTION # 38
You have three Azure IoT hubs named Hub1, Hub2, and Hub3, a Device Provisioning Service instance, and an IoT device named Device1.
Each IoT hub is deployed to a separate Azure region. Device enrollment uses the Lowest latency allocation policy.
The Device Provisioning Service uses the Lowest latency allocation policy. Device1 is auto-provisioned to Hub1 by using the Device Provisioning Service. Device1 regularly moves between regions.
You need to ensure that Device1 always connects to the IoT hub that has the lowest latency. What should you do?
- A. Disenroll and reenroll Device1.
- B. Configure device attestation that uses X.509 certificates.
- C. Implement device certificate rolling.
- D. Configure the re-provisioning policy.
Answer: D
Explanation:
Automated re-provisioning support.
Microsoft added first-class support for device re-provisioning which allows devices to be reassigned to a different IoT solution sometime after the initial solution assignment. Re-provisioning support is available in two options:
Factory reset, in which the device twin data for the new IoT hub is populated from the enrollment list instead of the old IoT hub. This is common for factory reset scenarios as well as leased device scenarios. Migration, in which device twin data is moved from the old IoT hub to the new IoT hub. This is common for scenarios in which a device is moving between geographies.
Reference:
https://azure.microsoft.com/en-us/blog/new-year-newly-available-iot-hub-device-provisioning-service-features/
NEW QUESTION # 39
You have an Azure IoT solution that includes an Azure IoT Hub named Hub1 and an Azure IoT Edge device named Edge1. Edge1 connects to Hub1.
You need to deploy a temperature module to Edge1. What should you do?
- A. Create an IoT Edge deployment manifest that specifies the temperature module and the route to
$upstream. From a Bush prompt, run the following command:
az iot hub monitor-events-device-id Edge1 -hub-name Hub1 - B. From the Azure portal, navigate to Hub1 and select IoT Edge. Select Edge1, select Device Twin, and then set the deployment manifest as a desired property. From a Bash prompt, run the following command az iot hub monitor-events-device-id Edge1 -hub-name Hub1
- C. From the Azure portal, navigate to Hub1 and select IoT Edge. Select Edge1, and then select Manage Child Devices. From a Bash prompt, run the following command:
az iot edge set-modules -device-id Edge1 -hub-name Hub1 -content C:\deploymentMan1.json - D. Create an IoT Edge deployment manifest that specifies the temperature module and the route to
$upstream. From a Bush prompt, run the following command:
az iot edge set-modules -device-id Edge1 -hub-name Hub1 -content C:\deploymentMan1.json
Answer: D
Explanation:
You deploy modules to your device by applying the deployment manifest that you configured with the module information.
Change directories into the folder where your deployment manifest is saved. If you used one of the VS Code IoT Edge templates, use the deployment.json file in the config folder of your solution directory and not the deployment.template.json file.
Use the following command to apply the configuration to an IoT Edge device:
az iot edge set-modules --device-id [device id] --hub-name [hub name] --content [file path] Reference:
https://docs.microsoft.com/en-us/azure/iot-edge/how-to-deploy-modules-cli
NEW QUESTION # 40
You need to configure Stream Analytics to meet the POV requirements.
What are two ways to achieve the goal? Each Answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A. Route telemetry to an Azure Blob storage custom endpoint, and then configure the Blob storage as a reference input for Stream Analytics.
- B. From IoT Hub, create a custom event hub endpoint, and then configure the endpoint as an input to Stream Analytics.
- C. Create an input in Stream Analytics that uses the built-in events endpoint of IoT Hub as the source.
- D. Create a Stream Analytics module, and then deploy the module to all IoT Edge devices in the fleet.
Answer: B,C
Explanation:
Explanation
NEW QUESTION # 41
You plan to deploy Azure Time Series Insights.
What should you create on iothub1 before you deploy Time Series Insights?
- A. a new shared access policy
- B. an IP filter rule
- C. a new message route
- D. a new consumer group
Answer: D
Explanation:
Create a dedicated consumer group in the IoT hub for the Time Series Insights environment to consume from. Each Time Series Insights event source must have its own dedicated consumer group that isn't shared with any other consumer. If multiple readers consume events from the same consumer group, all readers are likely to exhibit failures.
Reference:
https://docs.microsoft.com/en-us/azure/time-series-insights/time-series-insights-how-to-add-an-event-source- iothub
Topic 2, A Datum
Case Study
This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other question on this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next sections of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question on this case study, click the Next button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the Question button to return to the question.
Requirements. Planned Changes
ADatum is developing an Azure IoT solution to monitor environmental conditions. The IoT solution consists of hardware devices and cloud services. All the devices will communicate directly to Azure IoT Hub.
The hardware devices will be deployed to the branch offices and will collect data about various environmental conditions such as temperature, humidity, air quality, and noise level. The devices will be wired by using Power over Ethernet (PoE) connections.
ADatum is developing the solution in the following three phases: proof of value (POV), pilot, and production.
Requirements. POV Requirements
The POV phase will demonstrate that a technical solution is viable. During this phase, 100 devices will be deployed to the main office and Azure Stream Analytics will be connected to an IoT hub to generate real-time alerts. Stream Analytics will perform the following processing:
* Calculate the median rate of the telemetry across the entire devices that exceed the median rate by a factor of 4.
* Compare the current telemetry to the specified thresholds and issue alerts when telemetry values are out of range.
* Ensure that all message content during this phase is human readable to simplify debugging.
Requirements. Pilot Requirements
During the pilot phase, devices will be deployed to 10 offices. Each office will have up to 1,000 devices.
During this phase, you will add Azure Time Series Insights in parallel to Stream Analytics to support real-time graphs and queries in a dashboard web app.
The pilot deployment must minimize operating costs.
Requirements. Production Requirements
The production phase will include all the offices.
The production deployment will have one IoT hub in each Azure region. Devices must connect to the IoT hub in their region.
The production phase must meet the following requirements:
Ensure that the IoT solution can support performance and scale targets.
Ensure that the IoT solution support up to 1,000 devices per office.
Minimize operating costs of the IoT solution.
Requirements. Technical Requirements
Datum identifies the following requirements for the planned IoT solution:
* The solution must generate real-time alerts when a fire condition is detected in an office. All the devices in that office must trigger an audible alarm siren within 10 seconds of the alert.
* A dashboard UI must display alerts and the system status in real time and must allow device operators to make adjustments to the system.
* Each device will send hourly updates to IoT Hub. Condition alerts will be sent immediately.
* Multiple types of devices will collect telemetry that has different schemas.
* IoT Hub must perform message routing based on the message body.
* Direct methods must be used for cloud-to-device communication.
* Reports must be provided monthly, quarterly, and annually.
* Stored data queries must be as efficient as possible.
* The device message size will be under 4 KB.
* Development effort must be minimized.
Requirements. Throttle and Quotas
The relevant throttles and quotas for various IoT Hub tiers are shown in the following table.
Requirements. IoT Hub Routing
You plan to implement IoT Hub routing during the POV phase as shown in the following exhibit.
NEW QUESTION # 42
You have an Azure 10T solution.
You plan to register an Azure loT Edge device by using X.509 self-signed certificates.
You need to provide the thumbprint for the primary and secondary certificates.
Solution: You generate a 64-hex character SHA256 hash for the certificates.
Does this meet the goal?
- A. No
- B. Yes
Answer: A
NEW QUESTION # 43
You need to configure loT module routing to meet the device requirements.
How should you complete the route? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION # 44
You need to enable telemetry message tracing through the entire IoT solution.
What should you do?
- A. Implement distributed tracing.
- B. Monitor device lifecycle events.
- C. Enable the DeviceTelemetry diagnostic log and stream the log data to an Azure event hub.
- D. Upload IoT device logs by using the File upload feature.
Answer: A
Explanation:
IoT Hub is one of the first Azure services to support distributed tracing. As more Azure services support distributed tracing, you'll be able trace IoT messages throughout the Azure services involved in your solution.
Note:
Enabling distributed tracing for IoT Hub gives you the ability to:
Precisely monitor the flow of each message through IoT Hub using trace context. This trace context includes correlation IDs that allow you to correlate events from one component with events from another component. It can be applied for a subset or all IoT device messages using device twin.
Automatically log the trace context to Azure Monitor diagnostic logs.
Measure and understand message flow and latency from devices to IoT Hub and routing endpoints. Start considering how you want to implement distributed tracing for the non-Azure services in your IoT solution.
Reference:
https://docs.microsoft.com/en-us/azure/iot-hub/iot-hub-distributed-tracing
NEW QUESTION # 45
You have an Azure Stream Analytics job that connects to an Azure IoT hub named Hub1445 as a streamingdata source. Hub1445 is configured as shown in the exhibit. (Click the Exhibit tab.)
The Stream Analytics job fails to receive any messages from the IoT hub. What should you do to resolve the issue?
- A. Enable the Route3 route.
- B. Change the Route1 route query to true.
- C. Disable the Route2 route.
- D. Enable the fallback route.
Answer: B
Explanation:
The device telemetry is usually passed as JSON from the device through the IoT Hub - this is handled nicely by Azure Streaming Analytics queries.
The IoT Hub message routing should be configured as follows: Data source: Device Telemetry Messages Routing query: true (as the routing query is an expression that evaluates to true or false for each received message, the simplest way to send all messages to the endpoint is to just supply true as the query).
Reference:
https://darenmay.com/blog/azure-iot-streaming-analytics-data-lake-analytics-and-json/
NEW QUESTION # 46
You have an Azure IoT Edge device named Edge1.
You need to configure the module container to link the module storage to the host storage.
How should you configure the deployment manifest? To answer, drag the appropriate keys to the correct targets. Each key may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Reference:
https://docs.microsoft.com/en-us/azure/iot-edge/how-to-use-create-options
NEW QUESTION # 47
You have an Azure subscription that contains an Azure Time Series Insights environment. The environment has the properties shown in the following table.
You need to create a D.
Which two time series expressions can be correctly used as part of the query? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A. $event.p2 = 'abc'
- B. $event.p1.String = 'abc'
- C. $event.p4.p5 = 0.0
- D. $event['p1'] != NULL
Answer: B,D
Explanation:
Example: $event['p1'] != NULL
['p1'] is the only token used. Interpreted as $event['p1'].Double != NULL Reference:
https://docs.microsoft.com/en-us/rest/api/time-series-insights/reference-time-series-expression-syntax
NEW QUESTION # 48
You have an Azure IoT solution that includes an Azure IoT hub.
You plan to deploy 10,000 IoT devices.
You need to validate the performance of the IoT solution while 10,000 concurrently connected devices stream telemetry. The solution must minimize effort.
What should you deploy?
- A. an Azure IoT Device Simulation from Azure IoT Solution Accelerator
- B. Azure IoT Central application and a template for the retail industry
- C. an Azure IoT Edge gateway configured as a protocol translation gateway
- D. an Azure function, an IoT Hub device SDK, and a timer trigger
Answer: A
Explanation:
Explanation
The IoT solution accelerators are complete, ready-to-deploy IoT solutions that implement common IoT scenarios. The scenarios include connected factory and device simulation.
Use the Device Simulation solution accelerator to run simulated devices that generate realistic telemetry. You can use this solution accelerator to test the behavior of the other solution accelerators or to test your own custom IoT solutions.
Reference:
https://docs.microsoft.com/en-us/azure/iot-accelerators/about-iot-accelerators
NEW QUESTION # 49
You have an Azure IoT hub named Hub1 and an Azure Time Series Insights environment named tsi1. Tsi1 connects to Hub1. The solution has been operational for 6 months.
Tsi1 is configured as shown in the following exhibit.
Hub1 receives 1 million messages per day. Each message is up to 1 KB and is formatted as JSON.
Hub1 has seven days of retained telemetry.
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Reference:
https://docs.microsoft.com/en-us/azure/time-series-insights/time-series-insights-overview
NEW QUESTION # 50
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
You have 20 IoT devices deployed across two floors of a building. The devices on the first floor must be set to 60 degrees. The devices on the second floor must be set to 80 degrees.
The device twins are configured to use a tag that identifies the floor on which the twins are located.
You create the following automatic configuration for the devices on the first floor.
You create the following automatic configuration for the devices on the second floor.
The IoT devices on the first floor report that the temperature is set to 80 degrees.
You need to ensure that the first-floor devices are set to the correct temperature.
Solution: In the automatic configuration for the second-floor devices, you set targetCondition to "tags.floor='second'".
Does this meet the goal?
- A. Yes
- B. No
Answer: A
Explanation:
Reference:
https://docs.microsoft.com/en-us/azure/iot-edge/module-deployment-monitoring?view=iotedge-2020-11
https://docs.microsoft.com/en-us/azure/iot-hub/iot-hub-automatic-device-management-cli
NEW QUESTION # 51
You plan to deploy an Azure IoT hub.
The IoT hub must support the following:
* Three Azure IoT Edge devices
* 2,500 IoT devices
Each IoT device will spend a 6 KB message every five seconds.
You need to size the IoT hub to support the devices. The solution must minimize costs.
What should you choose?
- A. one unit of the B1 tier
- B. one unit of the S1 tier
- C. one unit of the B2 tier
- D. one unit of the S3 tier
Answer: D
Explanation:
2500* 6 KB * 12 = 180,000 KB/minute = 180 MB/Minute.
B3, S3 can handle up to 814 MB/minute per unit.
Incorrect Answers:
A, C: B1, S1 can only handle up to 1111 KB/minute per unit
B: B2, S2 can only handle up to 16 MB/minute per unit.
Reference:
https://docs.microsoft.com/en-us/azure/iot-hub/iot-hub-scaling
NEW QUESTION # 52
......
100% Passing Guarantee - Brilliant AZ-220 Exam Questions PDF: https://www.vce4plus.com/Microsoft/AZ-220-valid-vce-dumps.html
Get New AZ-220 Certification – Valid Exam Dumps Questions: https://drive.google.com/open?id=1wTO2idtt1zLUmWbMWVl8VC6zjk5M1vf6